Engadine Residential Rapid Installation – Concrete Sleeper Retaining Wall

The Challenge

This residence was being constructed on the cleared site of a knock down development. The design was a split-level residence & located between a footpath reserve and the adjoining existing property.

Our Solution

Solve Civil re-allocated resources and was able to start the installation as soon as the material was on site. We installed the wall in a very restricted environment that enabled the construction to continue on schedule while ensuring no damage to the adjacent property.

 

The Result

Details:

Canberra Concrete Sleepers – wood grain charcoal finish

Very narrow working area between adjoining house and residence construction.

Rock & hard ground excavation

Hand work required to install posts, sleepers, ag drain & backfill