The existing road and accessways at a busy freight terminal were deteriorating, affecting operations and safety. Given the high traffic load, the work had to be completed within a strict 11 PM – 4 AM window to minimize disruption while ensuring quality and safety.
Solve Civil executed a time-sensitive refurbishment, including:
The completed works restored the freight terminal’s accessways to optimal condition, ensuring a safer and smoother surface for heavy vehicle traffic. The project was executed efficiently within the restricted timeframes, minimizing operational impact while delivering a durable long-term solution.