This residence was being constructed on the cleared site of a knock down development. The design was a split-level residence & located between a footpath reserve and the adjoining existing property.
Our Solution
Solve Civil re-allocated resources and was able to start the installation as soon as the material was on site. We installed the wall in a very restricted environment that enabled the construction to continue on schedule while ensuring no damage to the adjacent property.