Bushfire Protection Upgrade at Mt Tomah Botanic Gardens

The Challenge

The project required the development of bushfire protection infrastructure to meet stringent safety standards and ensure long-term fire readiness. The client needed a reliable solution that could withstand potential bushfire threats and provide immediate access to essential resources, such as water for firefighting, while complying with Australian Standard AS2419.

Client
Mt Tomah Botanic Gardens
Location
Mt Tomah Botanic Gardens

Our Solution

Solve Civil designed and constructed a comprehensive bushfire protection system, ensuring high standards of safety and efficiency. This included full earthworks excavation, the installation of a 165,000L concrete tank, and the setup of a remote start 1,000L/min pump connected to a fire hydrant for refilling fire trucks. The project was certified under AS2419, guaranteeing compliance with all fire readiness requirements.

The Result

The completed infrastructure ensures optimal bushfire protection with a robust, high-capacity water supply and efficient firefighting capabilities. The installation of the concrete tank and fire hydrant system significantly enhances fire safety and readiness, providing long-term protection. The project exemplifies Solve Civil’s commitment to quality, safety, and reliability in delivering critical infrastructure solutions for bushfire protection.

More Projects

Wallerawang Sewer Pump Station Replacement

Learn more

Mt Tomah Water Tank Refurbishment

Learn more

Capability Statement Download​